Review the application
A CCS grounding discussion does not establish suitability as photovoltaic ribbon or module interconnection material. Those requirements belong to a separate material and process review.
Information to provide
- Is the requirement grounding, a cable conductor or another component?
- What current/fault duty and environment are specified?
- Which conductor and complete connection tests are required?
Confirm the proposed construction
Agree on conductor function and project duty.
Evaluate samples and the specified connections/environment.
Complete the project acceptance plan before material substitution.