CCS railway construction: plan supply and acceptance together

Original publication: · Reviewed:

A railway construction inquiry should include the conductor drawing, installation method and operator requirements. Align sample acceptance and documentation with procurement timing before committing to a material substitution.

Review the application

An example use of CCS does not establish approval for every rail system, bonding function or connection. Specify the application and obtain the required project qualification.

Information to provide

Confirm the proposed construction

Align the conductor and connection drawing with the operator specification.

Review trial material and the tests required for the stated mechanical and electrical duty.

Confirm the project acceptance process before moving from sample evaluation to supply.