CCS railway infrastructure: separate the conductor duties

Original publication: · Reviewed:

Railway signaling, bonding, grounding and mechanically loaded wires have different acceptance requirements. Identify the precise subsystem and responsible engineering specification before evaluating a CCS construction.

Review the application

An example use of CCS does not establish approval for every rail system, bonding function or connection. Specify the application and obtain the required project qualification.

Information to provide

Confirm the proposed construction

Align the conductor and connection drawing with the operator specification.

Review trial material and the tests required for the stated mechanical and electrical duty.

Confirm the project acceptance process before moving from sample evaluation to supply.